Northern Rail
|
|
||||||
RE: Northern Rail
(14/01/2016 13:52)knutstransport Wrote: It's more in comparison to other unit types, apparently there's 15 x 323s in service in the morning peak on weekdays and 1 x 323 is out long-term for re-tractioning work leaving only 1 other 323 spare. The 142(044) that worked the 1016 Lime St to Man Air and return wasn't off an Airport working,it was additional off Allerton depot,did the 1016 Lime St - Man Air and return and then went empty Lime St-Manchester Victoria at 1247 to assist with the afternoon service out of Manchester Victoria |
||||||
|
||||||
RE: Northern Rail
What a come down for the passengers used to getting a 319 on the Manchester airport service , I have to admit though a 142 on good rails can't half shift if its healthy and running on both engines with a gearbox that works . |
||||||
|
||||||
RE: Northern Rail
There are some decent 142's out there. Still an EMU will leave a DMU for dead (if driven correctly) I've heard another 319 was having problems this morning. Don't know as wasn't up that early. |
||||||
|
||||||
RE: Northern Rail
I bet Northern are thinking lets see if arriva can get these 319's more reliable , seeing as there probably going to have to take on more of them when the 323 go to london Midland . |
||||||
|
||||||
RE: Northern Rail
The 22:09 Manchester Victoria - Liverpool Lime Street failed in the neutral section near Eccles tonight and was there for nearly 2 hours. 361 and 378 the units involved so I'm told |
||||||
|
||||||
RE: Northern Rail
How long are Neutral sections ? |
||||||
|
||||||
RE: Northern Rail
They aren't long at all... I don't know the exact distance but they normally on,y last for a few seconds when the train is going along |
||||||
|
||||||
RE: Northern Rail
A standard neutral section is 155 feet long. The dead section of wire is 15 feet long. SD. |
||||||
|
||||||
|
||||||