					Virgin Trains
				 | 
| 
 | ||||||
| 
					RE: Virgin Trains   The power cars of 390013 have been given a special Christmas livery as has VTEC 91128. All time rail mileage travelled 327264 miles | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   The VTWC pendolino is nicknamed the Penguilino and the VTEC is claus91 | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Former Virgin Trains 86247 has been broken up at Basford Hall. All time rail mileage travelled 327264 miles | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Virgin Trains are not operating services north of preston due to the weather conditions further north. | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Virgin Trains are once again on the move in Cumbria , there is a speed restrictions in numerous area's. These floods have been devastating for all and will take ages to recover. | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   (08/12/2015 16:35)wirralbus Wrote: Virgin Trains are once again on the move in Cumbria , there is a speed restrictions in numerous area's. The line between Carlisle and Glasgow was reopened yesterday afternoon All time rail mileage travelled 327264 miles | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Due to damage to Lamington Viaduct services on the WCML will be operating between London Euston - Carlisle , road replacement is being provided for passengers travelling further north. | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   The early indications are that the viaduct has dropped by approx 2 ft with damaged beams and parapets , more is expected to be known when engineers can get a proper look when the weather and river conditions improve enough . | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Now confirmed that services are not now expected to resume over lamington Viaduct until at least 8th January weather permitting. | ||||||
| 
 | ||||||
| 
					RE: Virgin Trains   Now we are nearing nearly three weeks of the closure between Carlisle / Lockerbie and Carstairs , isn't there group standard's issued by Network Rail that require train drivers to do route learning again . Any idea if the closure is only till the 1st February or will it be a significantly longer closure. | ||||||
| 
					« Next Oldest | Next Newest »
				 | 
User(s) browsing this thread: 11 Guest(s)
 


 