| 
					Liverpool Lime Street to get an overhaul
				 | 
| 
 | ||||||
| 
					RE: Liverpool Lime Street to get an Overhall   (03/04/2015 08:00)wirralbus Wrote: Looking at the slideshow , it looks like the the lengthening of what at present is Platform 2 would block anything into Platform 1 hence it being removed . Judging by those diagrams the gap between the existing Platforms 3 & 4 looks narrower than the gap between the lengthened Platform 2 and Platform 1. I don't think that the extension of Platform 2 will render Platform 1 inaccessible to the shorter length trains that use it at present If a point was positioned at the existing edge of Platform 2 then Platform 1 could be retained for use by 2-car or 3-car Northern franchise services. Platforms 3 & 4 are accessed via a point from a single access track - so I don't see why something similar couldn't be used to keep Platform 1 operational after the rebuild | ||||||
| 
					« Next Oldest | Next Newest »
				 | 
User(s) browsing this thread: 3 Guest(s)
 


 



