Stagecoach Manchester
|
|
||||||
RE: Stagecoach Manchester
Conversion time depends on a lot of things, and to be honest I don't really know. Obviously if you want to do the job 'properly' to a high standard it will take longer. Once the doors are taken out, the electric ramp needs removing and the floor building up - including braces. Then the framework for side panels and the window needs to be put in. If you were really making a good job, you'd look to take out the door operating mechanisms and remove the associated wiring, and remove the privacy screens, before installing a light tube. Either way, there's at least a few days work per vehicle. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 18 Guest(s)