Arriva Trains Wales
|
|
||||||
RE: Arriva Trains Wales
When the line eventually reopeens north of Harlech wont the ERTMS have to be retested to ensure that it is safe to use once again , as it will not have been used for a length of time . Im surprised that Network Rail never thought that there would be movement in the riverbed at this location |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 30 Guest(s)