Crossrail (TfL Rail)
|
|
||||||
RE: Crossrail
Probably the two year delay in the Thameslink contract means that there is no space at Krefeld to build Crossrail stock in the required timescale. All time rail mileage travelled 327264 miles |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 6 Guest(s)