Current time: 24/05/2025, 19:27 Hello There, Guest! (LoginRegister)

Post Reply 
Arriva North West - St Helens Depot
RE: Arriva North West - St Helens Depot
Absolutely K853, the point I was trying to get across though was the fact that there is certainly potential for it to go back on the road, as a short term solution, without the outlay of a brand new engine or the like with the parts being readily available. Like I said, I was never trying to insinuate that it would definitely be returning to the road or the like ;-)!

As an aside, other than them sharing 2(?) pits for structural work, I'm fairly certain, though do stand to be corrected, that the engineering work is separate to that of the lads carrying out the P&P work so the workload of one shouldn't really impact the other massively.

(23/01/2013 22:21)K101HUM Wrote:  One does have to ask after this when to draw the line.
I think this is pretty much the underlying factor. Particularly when you could be getting into a situation whereby the cost of putting new engines in, which could be put to other uses, may be becoming greater than the actual value of the vehicle to the company.

[Image: 1chYP.jpg]
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Arriva North West - St Helens Depot - CX54 DKD - 23/01/2013 22:56



User(s) browsing this thread: 43 Guest(s)