Warrington's Own Buses
|
|
||||||
RE: WBT Network Warrington
I think one thing that does not help is that WBT keep the same PVR all day, which leads to the messy timetabling in the peaks, rather than investing in an extra bus to maintain an even headway throughout the day (look at the 19 and 28/28A especially at the Leigh end). This also leads to key services like the 20/21 seeing a frequency reduction during the peaks (12 mins instead of 10 mins). Also, the same timetabling is used on Saturdays - have you seen the 19 and 28/28A? Why could they not just run a clockface timetable all day? |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 14 Guest(s)