Current time: 07/06/2025, 05:10 Hello There, Guest! (LoginRegister)

Post Reply 
Arriva North West - St Helens Depot
RE: Arriva North West - St Helens Depot
(27/12/2023 20:01)North West Bus Spotter Wrote:  I've got a question, with the 360 going hourly, what will happen with the 329 interworking with it?

Presumably interwork with every ‘other’ 329.

One will go to Warrington and then to Wigan as the 360
The other will just go Warrington and back to St Helens

The 329 takes around 40 minutes and the 360 50 minutes each way. Together that would be a PVR of 5 with 15 minutes layover.

For example (Not actual times):
00 Dep St Helens (329)
40 Arr Warrington
45 Dep Warrington (329)
25 Arr. St Helens

Then the bus would do:
30 Dep St Helens (329)
10 Arr Warrington
15 Dep Warrington (360)
10 Wigan
15 Dep Wigan (360)
05 Arr Warrington
15 Dep Warrington (329)
55 Arr St Helens
And then as above
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Arriva North West - St Helens Depot - Raawwwrrr! - 27/12/2023 21:32



User(s) browsing this thread: 56 Guest(s)