Greater Manchester Service Changes
|
|
||||||
RE: Greater Manchester Service Changes
(24/03/2021 11:43)knutstransport Wrote: TfGM saying there are no changes planned in the next month, given a lot of routes are changing operator in April I don't think that's helpful even if the new operator will be retaining the same timetables. I have noticed this too, it is very common in Greater Manchester to get about 1 - 2 weeks for service changes when I think it would be great to have 2 months notice period 1 month being consultation period about the proposed changes then the other being notice period of change. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 10 Guest(s)