Arriva North West - Birkenhead Depot
|
|
||||||
RE: Arriva North West - Birkenhead Depot
I just think Arriva have had enough of the delays and Arriva have had to decide with the legal requirement for withdrawing the service. How long does it take to put in the bridge , this closure started whilst the Liverpool Loop line closure was in place so its a fairly long time . Maybe the enforced withdrawal may mean an alteration to the 411 route in the longer term to cover some of the 408 in a longer wallasey loop. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 14 Guest(s)