Current time: 15/11/2024, 02:03 Hello There, Guest! (LoginRegister)

Post Reply 
Northern (Arriva Rail North)
RE: Northern (Arriva Rail North)
(13/01/2018 21:33)Metroline1511 Wrote:  On the thread about the delayed electrification via Bolton I kept getting a warped message about my post being too long. So, I shall make my point here.

I now reckon that I shall ride electric trains to Blackpool North via Bolton for the first time on the same day. I would wait until the tram line via Blackpool North has opened.

It seems to be because I gave the original thread a post subject 3 characters below the minimum and when you add a reply the default post subject for your reply adds "RE: " i.e. 4 characters, so deleting "RE: " from the post subject (the box above the message box) fixes the problem.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Northern (Arriva Rail North) - knutstransport - 14/01/2018 10:33



User(s) browsing this thread: 20 Guest(s)