| 
					Cheshire East proposed funding cuts
				 | 
| 
 | ||||||
| 
					RE: Cheshire East proposed funding cuts   The route identifiers might be internal references, with the winning bidder able to choose the route number. A similar practise happened in Dorset - they tendered routes that they referred to as 1 to 7, however the operators were able to select what number was used (the same as existing in 5 out of 7). | ||||||
| 
					« Next Oldest | Next Newest »
				 | 
User(s) browsing this thread: 6 Guest(s)
 

 


