Cheshire East proposed funding cuts
|
|
||||||
RE: Cheshire East proposed funding cuts
As a summary these will be what is to go out-to-tender: Route A Macclesfield - Prestbury (19 replacement) PVR: 1 Minimum seating capacity of vehicle: 21 Route B Crewe - Nantwich (39 replacement) PVR: 1 Minimum seating capacity of vehicle: 27 Route C: Congleton - Crewe (42 and 85A replacement) PVR: 3 Minimum seating capacity of vehicles: 35 (Route D: Buxton and Hayfield services managed by Derbyshire CC so no Cheshire East tender) Route E Altrincham to Knutsford/Northwich/Macclesfield (27, 88, 188 and 289 replacement) PVR: 4 Minimum seating capacity of vehicles: 39 Route F Macclesfield to Stockport via Bollington or Kerridge (P1, 11 and 392 replacement) PVR: 3 Minimum seating capacity of vehicles: 21 and 23 Route G Nantwich services (51, 52, 53, 71,72, 73, 56, 75, 79, 83 and 89 replacement) PVR: 2 Minimum seating capacity of vehicles: 27 Route H Congleton services (90, 91, 92 replacement) PVR: 2 Minimum seating capacity of vehicles: 27 Route J Leighton Hospital - Alsager - Rode Heath - Congleton and Sandbach circulars (77, 78, 315, 319 and SB1-SB3 replacement) PVR: 3 Minimum seating capacity of vehicles: 27 |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 3 Guest(s)