Initial Arriva Merseyside network
|
|
||||||
RE: Initial Arriva Merseyside network
(24/08/2017 06:58)St Helens Rider Wrote: The X8 by this time was definitely a shadow of it's former self having at one point in the 90's run from Banks to Llandudno. I remember catching the X8 summer 96 when it went to Llandudno i've still got a Chester area timetable summer 96 somewhere, X8 North Western & X1 Crosville Wales Coastliner merged summer 96 as X8 Llandudno Junction-Banks, summer 97 it was X8 Rhyl-Banks, the Wales Coastliner section was a shadow of it's former self only operating in summer, before being permanently withdrawn after summer 97. As i've mentioned Crosville/North Western X8 Banks-Chester was split in Liverpool summer 98, Crosville operating Chester-Liverpool section which is now the Stagecoach Gold 1, & North Western Liverpool-Banks part of the Southport section hasn't been replaced as that went down Duke Street between Ainsdale & Southport, although Arrive 47 & Stagecoach X2 is near the line of the old X8. My Flickr site http://www.flickr.com/photos/31135444@N02/ |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 2 Guest(s)