(07/08/2017 20:11)knutstransport Wrote:  Porterbrook said it was possible. They also said 3 car 319s with corridor connectors and improved acceleration was possible!

Given the money anything is possible. Porterbrook did have a nice pic of a 319 with a new cab end on. To make one 3 car would mean a lot of work, it is possible but easier to do a 321, probably why that happened!

In the end it was touch and go whether there would be any money for even a modest refurb, which thankfully the initial batch of 319/3's got. When the first few came North in ex Thameslink condition they could best be described as tatty.