Arriva North West - Winsford Depot
|
|
||||||
RE: Arriva North West - Winsford Depot
(10/04/2017 07:23)dca529x Wrote: The 130 has been in managed decline for quite some time and even the Sunday contract appears to have been dragged into that now, with its unreliability and in this particular case using vehicles not really suited to it. If the vehicle used doesn't meet the capacity required by the contract then Arriva could be penalised. However, given what GHA got away with on contracted services (especially the 200) I can't see the penalty being any more than a reminder of the required capacity or a deduction from the subsidy. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 25 Guest(s)